Energy Infrastructure Partners and the Energy Science Center at ETH Zurich have signed a research collaboration. In this collaboration, EIP and ESC under the lead of Dr. Marius Schwarz have developed scenarios for the future of Switzerland’s electricity system and tested several shock scenarios. Results show that reducing grid transfer capacities to 30 percent in 2050 as an unforeseen shock or drastically reducing the availability of nuclear power plants in France as the same type of shock does not result in supply issues. Only the scenario forcing Switzerland to keep a balanced winter trade balance results in supply issues.
See the results here.